Alot of work in the train room this week. I added 48 feet of display shelf. Replaced the ceiling tile that house a heating duct; it was starting to sag. Re-did the top of my mountain adding the Menards nuclear plant and the spaceship re-doing the surrounding scenery. A bought 2 halloween MTH ES-44 with 16 operating cars all in Halloween scheme. So the train room been a bustling. Next project is mounting lighting strips to the back of the layout facing the back wall so colored light shines up the wall.
|