Skip to main content

Reply to "What did you do on your layout today?"

Lots of great things everyone has been doing on the layout!!

Well, we finally got the plywood and everything else moved to make way for the 30" wide shelf on wall Number 2!!  Don't worry about that baseboard heater.  The power is disconnected.  I left it in case a future owner would want it.  There is enough heat comes in that room through the door and window opening to the laundry room.  

2020-02-24 18.33.55

Attachments

Images (1)
  • 2020-02-24 18.33.55

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×