Skip to main content

Reply to "What did you do on your layout today?"

Finished the painting of the Hotel and the elevated track area is installed, the hotel facade still needs a lot of work before it will be installed behind but very close to the track.

IMG_8731IMG_8715

 

Attachments

Images (2)
  • IMG_8731
  • IMG_8715

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×