Had time this weekend to finish wiring track power bus and blocks, before sub-roadbed is installed.  I'm wiring for conventional cab-control with block selectors.  It's a semi-portable layout with 3 sections, so I've avoided star wiring to minimize section jumpers.  Thanks to everyone on the forum for all the great ideas.12x12 L - Pegboard power panel and wheeled control console12x12 L - 14ga track ground bus and block wiring completed12x12 L - Barrier strip jumpers between layout sections