Finally, I started the revision to the "Valley of Bridges" layout. I need to create an access point on the far side of the layout along the wall. I climbed up on the layout and started unscrewing the track that is in the new quarry area.
The Lionel Rotary Hoppers started to arrive this week. I continue to box engines parked on the opposite side of the layout. Getting ready for upper level construction. Hard Hats, Hard Heads, working to remedy Hard-to-Reach areas of my layout.
I will take pictures soon. Have a good week.
Sincerely, John Rowlen