Skip to main content

Reply to "What did you do on your layout today?"

Just getting started on "Land Aquisition" (benchwork) for the railroad.  the "World" (basement) has been completed.

Thought ppl might enjoy the Frankenjig I made to get consistent height on the wall brackets.  Attached also is the latest plan for the St Joseph Industrial Park.

20210203 Frankenjig for wall brackets20210203 St Joe Industrial plan

Attachments

Images (2)
  • 20210203 Frankenjig for wall brackets: Frankenjig
  • 20210203 St Joe Industrial plan: Each square is 6".  Track goes through stub wall in upper RH corner of dwg.  Double arrows on outer track indicate the 2.5% decline from St Joe.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×