Skip to main content

Reply to "What did you do on your layout today?"

This is all I have been doing for the last three weekends.

Under the layout where all the drops come together and several sidings.91F1918B-D831-4FF2-84B7-BC26EA425448

This is where the right leg crosses the floor to get the above photo. It was easier than running wire 40 ft one way and the 40 ft back the other way as the layout is U Shaped. Down one leg across the floor and back up the other leg.

625FBDCF-DADE-4C0C-8435-071613F6ADC0

Attachments

Images (2)
  • 91F1918B-D831-4FF2-84B7-BC26EA425448
  • 625FBDCF-DADE-4C0C-8435-071613F6ADC0

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×