This is all I have been doing for the last three weekends.
Under the layout where all the drops come together and several sidings.
This is where the right leg crosses the floor to get the above photo. It was easier than running wire 40 ft one way and the 40 ft back the other way as the layout is U Shaped. Down one leg across the floor and back up the other leg.