Skip to main content

Reply to "What did you do on your layout today?"

@Miggy posted:

We had the layout engineer and Inspector working on the layout today. Going with outside mainline, inside loop and planning a spur for an engine to park with two cars. And someone is requesting an incline to upper level... Hmmmmm, and me, well, this is pretty high elevation for a carpet layout guy. Excuse me for a minute, I think I am getting a nosebleed from this high altitude.

DO I need a railing to keep engine from falling? EEEEKS! hope to test the main line for shorts with TIMEX. Video at eleven (Timex, a Mark Army400, "Takes a licking, keeps on ticking"

Builder-help-onTask

Chopper 5 Update on layout construction. Tethered Steam Engines, complete with Bell option, stand at the ready.

Attachments

Videos (1)
Layout-today

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×