Skip to main content

Reply to "What did you do on your layout today?"

Looks like another busy weekend. We had rain yesterday so I unfortunately had to postpone my outdoor chores to another day.

I spent a little more time on my new yard. I got the wires run for the motors and put the controllers together. I installed the half curves and cork on the turnouts too. Wiring will continue and I hope to get the straight track by the end of the week. I still have two small dead spots on the main that will need tweaking too.

2021-04-11 18.05.39

I will need to add the third spur to the control panel track plan along with power and uncoupler switches. Fortunately the MTH controls stack together and fit where the two 5122 controllers were.

2021-04-11 18.05.50

Bob

Attachments

Images (2)
  • 2021-04-11 18.05.39
  • 2021-04-11 18.05.50

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×