Skip to main content

Reply to "What did you do on your layout today?"

RSJB18

will need to add the third spur to the control panel track plan along with power and uncoupler switches. Fortunately the MTH controls stack together and fit where the two 5122 controllers were.

2021-04-11 18.05.50Wish  when I planned my layout an built six years ago I had experienced OGR.  I really like using a control such as yours an possibly Mike’s G!

I implemented what I was comfortable with then an not what is truly usable.

But, my trains move, and my engines do switch ☺️

I’m happy, but a guy can always wish he had a 442 under the hood 😀

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×