Skip to main content

Reply to "What did you do on your layout today?"

Well, I finally had some time today to work on the layout and I was able to install my newly built union station. Very pleased with how it came out -



AB757863-995B-46A3-A575-E52A778A721499773C90-5BF9-412D-A7C9-5588BE3C6747B95FDD59-8CE4-4A89-8C55-880EA73027AD1824A8AC-BFD7-4BE5-A557-2557049CBFDD



The sad part is that I need to now remove the station. After running trains for about three hours, two of the LED lights under it seem to have gone out. Hopefully it’s just a loose wire.  I’m actually not too upset about it. You really are never done working on the layout.  Fortunately, I made the station removable with easily detachable wire hookups for just such circumstances.  

Next up is a car ramp leading to the Main Street on the left side. On the right, I’m going to place a scale building crane holding the on ramp for that side. I’m going to place lighted barricades and a police car on that end of the street so traffic is stopped while construction proceeds.  Fun stuff!

Spectacularly clever design. Bravo!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×