Skip to main content

Reply to "What did you do on your layout today?"

Now, a day later, l have pictures of this framed, stick-built Wabash Valley grain elevator, using only the plans and opening no bags in kit.  Next to clad it with Evergreen siding, and details.

Attachments

Images (3)
  • IMG_20210425_082920989_HDR: Elevator frame from plans
  • IMG_20210425_082845248: Markle, Ind., Elevator, slightly bashed
  • IMG_20210425_082819831: Stick-built, from plans

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×