Skip to main content

Reply to "What did you do on your layout today?"

@Mark Boyce posted:


Last week I bought two Ross 042 LH switches, took a hiatus from scenery, and installed them this past weekend.  First, I needed to upgrade the table top with some of the last of my 5/8" plywood.  The switches are screwed down to the table, but the track is just sitting there for some roadbed to even things up to the two sides.  I already wired it and ran an engine through the switches, and it did fine.  Running at slow speed, I didn't notice any noise to speak of.  I think I will jut lay it all on the wood, since I am almost out of Homasote.  Here is one photograph.  Please take a look on my Blackwater Canyon Line topic for more detail.

Looking good Mark. 👍

Keep on building!🏗🧱🏭

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×