@RSJB18 posted:I got the other two yard tracks installed last night. I soldered drops onto the track and got the two magnets ready to go. When I went to install the magnets I drilled the hole for track 2 and hit the support beam underneath. After a few attempts to drill an angled hole to get out of the beam I decided to call it for the night. The board needs a good clean up before I continue.
@Apples55- changing the switches????? I might as well rip the whole layout down and start over. Not likely in the near future. Thanks for the nudge tho...
Bob
Bob, why does that always happen?? Slow but sure wins the race!
Paul always comes up with ideas 💡 like that! 😄😄