Skip to main content

Reply to "What did you do on your layout today?"

While recovering from some fairly major abdominal surgery, I received my latest order from Ross Custom Switches, and am now laying my second, inner loop. There are 6 power drops, and 8 switches involved, all with non-derailing being installed, so a lot of wiring and extensions to be made and placed. There is also and a lot of Ross Bed to be addressed for fit up, and stone painting.

Track Pics
IMG_1300
IMG_1301
IMG_1302
IMG_1303
Wiring Pics
Non-Derailing
IMG_1304
Power Drop
IMG_1306
Switch Actuator Wiring at Panel (Extensions)
IMG_1305

Attachments

Images (7)
  • IMG_1300
  • IMG_1301
  • IMG_1302
  • IMG_1303
  • IMG_1304
  • IMG_1306
  • IMG_1305

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×