Skip to main content

Reply to "What did you do on your layout today?"

@Dave Ripp. posted:

I got my allys painted and a few more buildings in place. I was having trouble picking the next row so I'm done for today. I also took a front picture of a building I've had questions on. It is half Woodland Scenics Davenport and half Menards Mercantile .

A1A2A3

Hi Dave, so I was correct that it was two buildings, but they are not back to back, but rather left side to back. You must have removed the wrought iron balconies on the left side of the Menards building? Woodland Scenics and Menards must share tooling and manufacturing?!

I did a little interior work on my Davenport building by enclosing 4 rooms on the second and third story and installing LED's in each room. I used 4 WS LED stick-on lights and a WS sequencing hub, so the lights go on and off in each room. The sequencing hub has an adjustment to increase or decrease the speed at which the lights go on and off. It looks like somebody is actually home.

Really looks great Dave, I'm having a blast watching your layout grow! Thanks for taking the time to photograph your progress!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×