Skip to main content

Reply to "What did you do on your layout today?"

Working on getting my subway track installed and wired.   A big shout out to @Tom Tee for most of the carpentry on the platform, he makes these jobs appear easy!  The whole deck was pre-fab and dropped in place in two pieces, very slick.

A trial run of the subway around the track was flawless, runs like a champ.

Attachments

Images (1)
  • mceclip0

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×