Skip to main content

Reply to "What did you do on your layout today?"

As previously mentioned, the proposed expansion is marked with the blue tape.  When you have limited space like this, the allotted area is mandated and track/buildings will be adjusted to fit.

I will probably use this as a switching annex as my layout has three loops with no switching possibilities. Also, my newest engines have Bluetooth control and would be easy to switch with.

I will hold back on the hinged lift bridge for now and contemplate its advantages and disadvantages.

The closeup illustrates the place where the Ross 042 switch will be used.

John

0455AFE6-2C86-4E8C-A910-A1512C88224C6EF02FBC-7C75-4246-98B6-F56A0DBF452A4E150317-AF03-4402-BD62-212E28C188A4

Attachments

Images (3)
  • 0455AFE6-2C86-4E8C-A910-A1512C88224C
  • 6EF02FBC-7C75-4246-98B6-F56A0DBF452A
  • 4E150317-AF03-4402-BD62-212E28C188A4
Last edited by Fendermain

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×