Skip to main content

Reply to "What did you do on your layout today?"

The new layout is progressing. I'm heavily into the accessory and switch wiring stage now. This is the back side of my control station which was featured in Run 327. I have capability for conventional, DCS, TMCC, and Legacy. At the moment, there is one other AIU which is located some distance from the 2 here. I figure I'll need another 2 AIUs before I'm done.

Chris

LVHR

IMG_1689

Attachments

Images (1)
  • IMG_1689

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×