Skip to main content

Reply to "What did you do on your layout today?"

Seth nice job on the depot. Your interior looks good.

Peter glad to see that you are feeling better. Flu and Covid mix can’t be pleasant.

The transfer table is going to be a nice addition. Do you plan to weather the gravel?

We have been working to install two 4-way Ross switches. They are in difficult to reach places and include four lanterns per switch. Both switches are installed. One  is wired, lanterns installed, wired, and tested only to find that one lantern appears to be slightly off/needs moving, another is not connected properly and is a morning job which is when things usually work best.

The other switch has been installed and one lantern attached.

Yesterday I got disgusted when the lantern had to be moved and I quit. This job needs two people, Rich has been tied up all week, PM today we are picking up Paula’s Christmas presents, so maybe we can finish the turnouts tomorrow.

We have installed about 40 turnouts and lanterns and they can sometimes be frustrating when easy to reach; these are in the worst location on the layout. Procrastination has lasted for months and completion is a New Year’s resolution. 🤬🤬🤬

Last edited by Bill Webb

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×