Not on the layout but some testing for the next project. I want to finish the scenery on my upper level in the back. Kind of the last major piece to do and it's been on my list for a long time. Here's the target area.
Before I start, I need to fix the track and turnouts. I noticed that the strait sections of track have started to bow from the weight of the trains passing. So since I need to replace them, I want to change out the 3 Lionel 5122 turnouts for K-line tubular turnouts. I have two right-hand, just need to find a left (a WTB post will be forth- coming). I hate the 5122's...the solenoid buzz drives me nuts. The K-line's are quiet. Wish I knew about K-line before I built the layout.
So getting to the point- I assembled the two turnouts I have with some track on my temporary workbench to see how various engines run through them. I tried a couple shorties, a Plymouth, BEEP and 0-6-0t steamer, and a SW1200 diesel. Everything went fine so at least I have a solid plan for the track work.
As a side note- the SW1200 is a Lionel Legacy w/Bluetooth. Nice option to grab my phone and use the LC app on track without a base connected. I still prefer my Cab-1L but the BT connectivity is convenient.
Bob