Chris,
You are correct the track was just laid out on the floor so I knew exactly where to put the bench work. Here is a current picture of what it looks like now. I also got a roll out control bench made and a control panel. Subway level wiring for power is done and happy to report after sitting in boxes for 5 years all subway sets fired right up and worked perfectly.