More wiring to the upper level yard ws done today. Pilot holes were drilled in the track ties in preparation for screwing down the yard track. We have one more yard wire to pull. That is the power to the Lionel 8-bulb floodlight tower that we received today in the mail. Once that is in place, it is time to put down the snow blanket, screw down the track and move onto the double loop of elevated track that will surround the engine storage facility. I have included some photos of the yard and the other elevation project as it stands, now.
|