Skip to main content

Reply to "What did you do on your layout today?"

More wiring to the upper level yard ws done today. Pilot holes were drilled in the track ties in preparation for screwing down the yard track. We have one more yard wire to pull. That is the power to the Lionel 8-bulb floodlight tower that we received today in the mail. Once that is in place, it is time to put down the snow blanket, screw down the track and move onto the double loop of elevated track that will surround the engine storage facility. I have included some photos of the yard and the other elevation project as it stands, now.

100_4438

100_4439

100_4441

100_4440

100_4442

100_4443

100_4444

100_4438

Attachments

Images (7)
  • 100_4438
  • 100_4439
  • 100_4441
  • 100_4440
  • 100_4442
  • 100_4443
  • 100_4444

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×