Skip to main content

Reply to "What did you do on your layout today?"

I went from one round tube yesterday to a wider two tube version.  This follows the prototype model.  Next is to find a tube to drain out of the bin about 3/4ths the way up which tube flexes at the bottom and into the box car door.  There is a building which houses the top of the  elevator leg on the top of the structure. 

IMG_4056

Attachments

Images (1)
  • IMG_4056

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×