THE GLACIER LINE UPDATE:
03-06-2014 I repaired the support bracket near the Glacier Gravel Company. I placed the main line transformer into its semi-permanent position. Connie painted the backdrop and “earth” in several places. Connie re-painted the Camp Disappointment Marker. Connie placed multiple trees in the area of the Goat Lick Bridge. I installed a ton of ground cover, pathways and bushes mostly in the area of Garry and Walton.