Today I Installed the following:
Drop down control shelf in front of the layout.
Installed 2 Volt Meters through a project lid and then installed that onto a piece
of 1/4" plywood and mounted all of it on an angle in front of the 2 controllers. It is actually drying overnight. I had to glue and angles piece of wood to make it angle on the shelf. Sought of..
I installed the electric feed to a power switch and then to the power bar.
I installed 1/2 of the Rope Lites under the layout. MUCH BETTER...
I made the backboard for all the power and power strips.
Here are some pictures of today.