Skip to main content

Reply to "What did you do on your layout today?"

I was busy today. I decided today that before I start on the upper part of my tunnel/mountain I needed to paint the wall in the room blue for sky. also I wanted to finally attach the tunel portals I worked on over the weekend so I did that tonight also. so here is a layout update of sorts. I also ordered a few things in the past few days I ordered 2 sc1 switch controllers and a station with 3 platforms 2 at almost 12 inchs and one at 24 inches.

20140326_010823

20140326_010834

20140326_010845

20140326_010939

20140326_010943

20140326_010955

20140326_011009

20140326_011041

20140326_011053

20140326_011102

20140326_011109

20140326_011119

20140326_011202

20140326_011226

20140326_011241

20140326_011252

20140326_011311

20140326_011335

CLW007D

Attachments

Images (17)
  • 20140326_010823: Blue wall painted tonight
  • 20140326_010834: Blue wall painted tonight
  • 20140326_010845: Blue wall painted tonight
  • 20140326_010939: 2 tunnel portals made from pink foam
  • 20140326_010955: tunnel portal made from pink foam
  • 20140326_011009: portal and wall portal from pink foam wall from foamcore
  • 20140326_011041: foamcore wall
  • 20140326_011102: mountain painted and retaining wall behind switch tower painted
  • 20140326_011109
  • 20140326_011119
  • 20140326_011202
  • 20140326_011226
  • 20140326_011241
  • 20140326_011252
  • 20140326_011311: another retaining wall
  • 20140326_011335: control panel at the moment
  • CLW007D: station and platforms I ordered it's about 6 weeks until it shows up

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×