Skip to main content

Reply to "What did you do on your layout today?"

What we did on the layout May 24 20161 Track Set up

1. Track set up.

2 Add the chicken wire

2. Add the chicken wire.

3 Trim Chicken Wire

3. Trim Chicken Wire.

4 Set up water - Hydrocal & Dish Soap

4. Set-up water Hydrocal & dish soap.

5 Set up work area

5. Set up work area.

6 Pour Hyrdrocal into the molds

6. Pour Hydrocal into the molds. Some are custom made molds.

7 Place the rock molds into position

7. Place the rock molds into position.

8 Placing the final molds into place

8. Placing the final molds into position.

Cheers from Train Room Gary Pan view 2

Attachments

Images (10)
  • What we did on the layout May 24 2016
  • 1 Track Set up
  • 2 Add the chicken wire
  • 3 Trim Chicken Wire
  • 4 Set up water - Hydrocal & Dish Soap
  • 5 Set up work area
  • 6 Pour Hyrdrocal into the molds
  • 7 Place the rock molds into position
  • 8 Placing the final molds into place
  • Cheers from Train Room Gary Pan view 2

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×