Skip to main content

Reply to "What did you do on your layout today?"

Heavily in the planning stages of my layout. It's time to get these trains off the floor and on to a display. I've worked out a simple 5x9 layout with 2 ovals, one outer running the parameter of the layout, one inner so the trains can pass close by. Now I'm just planning how to get a simple figure eight elevated in the middle of the layout. 3 sets of trains running at one time. Have been getting some great advise from folks on this board!

Right now I just have a large oval on the floor, constantly changing locomotives and rolling stock, haha. Can't wait to run it all at once. Spent some time cleaning the track and maintaining my loco's.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×