Skip to main content

Reply to "What did you do on your layout today?"

My weekend project:  My trolley station had a serious safety issue that was mitigated this weekend.  The retaining wall needed some kind of obstacle to prevent impaired passengers from wandering off in the wrong direction and doing a full or half gainer off the wall.  Solution - build a fence.  I first had to make a profile pattern to determine angles and post spacing.  Next I transferred the spacing to a wood strip and proceeded to construct a fence using 1/16 x.014 Sq brass from Precision Metals.  I had to make three sections and then join them together.  All that is left is to clean up the joints with a file, insert mounting pins, prime & finish coat and install.  This ought to get OSHA off my back!

Unfortunately, I was again able to ignore the Pink and Blue mountain calling me for another weekend.

Dave

DSC09950DSC09951DSC09956DSC09958DSC09946DSC09960DSC09963

Since this piece did not have an end post, I added a temporary wire keeper for support while soldering to the other section.

DSC09966

The keeper was removed after the two sections were joined

DSC09968

DSC09975

Keeper gone!

DSC09977

DSC09976

Finished except for inserting mounting pins (the square tubing has a hollow core).

DSC09978

Test fit.  Tomorrow its clean up some solder joints, add mounting pins, prime, finish coat and install. 

DSC09987

Maybe next week - the mountain!!!!!!!!!

 

 

 

 

 

 

Attachments

Images (15)
  • DSC09950
  • DSC09951
  • DSC09956
  • DSC09958
  • DSC09957
  • DSC09960
  • DSC09946
  • DSC09963
  • DSC09968
  • DSC09966
  • DSC09975
  • DSC09976
  • DSC09977
  • DSC09978
  • DSC09987
Last edited by darlander

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×