Big_Boy_4005 posted:I'm almost done with the hidden yard control relocation project.
Friday, I took the small hidden yard panel out, and built a new frame to mount both panels.
I also built the car card box to hold all the cards for all the trains in the yard, and mounted engine tag holders.
I also drilled holes in the counter top to run wires through.
The big hidden yard is done, but I'm having trouble with one critical turnout. The small hidden yard should go quickly. Now if only I could find my track cleaning car.
Elliot been following this. All the wiring and building the circuits, and relays, I know was a lot of tedious work but seeing Control panel with the cameras, this is even better then I imagine it would look like. Just a great way to control a layout.