Skip to main content

Reply to "What did you do on your layout today?"

I have been sick as a dog since my last post here eleven days ago. Today I was finally feeling good enough to go downstairs. When last I was down there, I had just popped the circuit breaker for the track power, after doing some high voltage rewiring. My solution to the problem was to add a second neutral wire in a piece of conduit about 25' long. I knew this was going to be a difficult task with three wires already in the pipe.

After two hours messing with this thing, I ran out of both strength and patience, and had to hang it up. I think I got it really close, like within 2', but I also got it really stuck. I guess tomorrow I'll have to pull it back, and take another run at it.

Can't run trains until this gets done.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×