here is some of the area planned for the mountainous scenery.......from the black boards up, which are all on a 1% grade up.......going around the room left to right, taken from the raised floor area of the upper level....
here is the upper mountain area that I started above the entrance doorway....
the garage door will be taken out in spring, removing these door tracks
please don't mind the crude construction method, but it is all free scrap wood,
this area will be a coal mine area in a valley......
view from ground level.....
view entering the train room....coal tipple area above door way,
upper yard area will be above the blue sky.......making a horseshoe shaped yard with a passenger station.......