Skip to main content

Reply to "What did you do on your layout today?"

IMG_9104

I worked on the benchwork tonight and it currently is about 85% complete! The track is just laying on top right now. Eventually it will go on some roadbed and be ballasted. The new "Eye Level Route" will have a 4 track mainline. I still haven't gotten the O81 for the inner most loop yet. Although you can't tell from the photo, none of the loops connect at the moment ( hence the 15% of benchwork left ). This is a milestone evening though because it marks the first time the ABBBA 12 car El Cap has ran together! Needless to say, it was like Christmas in October  

Attachments

Images (1)
  • IMG_9104

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×