Skip to main content

Reply to "What did you do on your layout today?"

In the process of installing relays and non-derailing on the three turnouts on the new upper level.  Gad, what a lot of wires to hook up to accomplish powering the off-hand rails so the lights don't blink!!  14+ wires ... power drops for track and turnout, etc ... taking both of us 3-4 hours per turnout with wire labels, etc.

And of course in testing we discovered the non-derailing isolated track sections are a couple of inches too short if the train is moving at a good clip.  Time to "tune" with a cutting wheel and solder plug.

Last edited by Kerrigan

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×