Skip to main content

Reply to "What did you do on your layout today?"

I was supposed to go to an NMRA meeting this morning, but when I woke up at 9:15 for a 9:30 event, it was obvious that I wasn't going. I had been going back and forth about it all week. What I really wanted to do was work on the layout, so I got downstairs by 10:00.

I spent the first two hours transcribing my work from Friday into the computer. What this is, is a list of all the signal heads that will be on the layout, 169 of them. They are broken down by masts, and each mast one, two or three heads. Each head has a long name in the first column and a short set of initials for JMRI. This is all about staying organized.

IMG_7755

I did a little more work on my river banks.

IMG_7750

There was no way around having to use the saber saw to cut that angle in the plywood. What a mess! Most of the sawdust stayed up top, but a bunch rained down on the trains. I spent about an hour cleaning that up.

IMG_7751

I added some lights to the hidden yard. Unfortunately, they didn't have the desired effect. They don't throw off enough light to keep the cameras in color mode when the room is dark. I still like them, and have two more strings to hang.

IMG_7752

While I was at it, I tied up all the wires. There are only a few wires for the signals left to add. Those will be easy because they will be Cat5's.

IMG_7753

Now I just have to put all the trains back together down there.

IMG_7754

Attachments

Images (6)
  • IMG_7755
  • IMG_7750
  • IMG_7751
  • IMG_7752
  • IMG_7753
  • IMG_7754
Last edited by Big_Boy_4005

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×