Skip to main content

Reply to "What did you do on your layout today?"

J,

   Broke out the Tin Plate and test ran the 263E Work Train Consist, with the 800 and 600 series Crane Cars, and Islay's rolling stock, on the new DCS/Legacy over head FasTrack Layout.  The 263E P2 ran smooth as Glass on the 1st generation FasTrack.  The construction on the Multi Track Bar DCS/Legacy Train layout, is coming along and the traditional floor type layout in front of the  Fire Place, is now in the planning stages.  Had to remove 5" of snow from the Driveway, Back Patio and Front Walk today also, this outside work ate into my layout building time.  Can you imagine my wife actually wanting me to due something else besides work on my Train Room at Christmas time.  I tell ya it's Husband abuse, the next time the Va medical people me ask if I feel I have been threatened.

Merry Christmas everybody!

PCRR/Dave 

DSCN2391

DSCN2392

Attachments

Images (2)
  • DSCN2391
  • DSCN2392
Last edited by Pine Creek Railroad

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×