Skip to main content

Reply to "What did you do on your layout today?"

Yesterday was busy with assembling track and and all those rebuilt 022 switches into the inner area of the layout. I also rewired about 3 of the controller switches, tested 5 more, and tied them into 8 of the 9 switches on the layout. The wiring is all run on top right now for testing purposes. Problems with a broken wire on the tender complicated things for a bit, however some time with the soldering iron took care of that. We ran trains, to the great enjoyment of both my grandson and I. Running them in the dark with just the switch lanterns, headlight, caboose light, and controller lights was just awesome.

Attachments

Images (2)
  • 20180101 Enjoying The Trains: That smile says it all...
  • 20180101 Overall Layout - First Wiring Verification

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×