Skip to main content

Reply to "What did you do on your layout today?"

Deuce posted:

Christmas vacation travel, bad weather, and sick kids conspired me from working on the table. But I had a couple of hours today and managed to complete the transformer table, as well as add the "top deck". The top deck is attached to the main table by four screws. It's where my above ground layout will be. When the kids grow in height, I will lift it up, and add a subway system underneath, and then place it back on top. So the table is sort of modular. Just need to put down 11/32" plywood, and a 1x4 bumper around the back and sides. I'll also build a small control box for a couple SPST switches that will control power to the sidings and a couple of accessories. And then to paint it all black.20180108_17085920180108_170905

20180108_170432

I’m glad you finally got a chance to get back at it!  Yes you have to plan for the kids to grow fast!!  Looks great!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×