Skip to main content

Reply to "What did you do on your layout today?"

Here you go Mike. I made some headway today. The track bumpers I got are all in place and so are the uncouple tracks. So now the whole freight yard is screwed down. I had a Korber switch tower that I had used on the attic layout but I think with all the switches I found a perfect spot for it by the small pond. I still have to vacuum up from drilling holes for the screws and lay down ground foam. The track work around the power plant is on hold until I can buy a small step ladder so I can get to the back of the tables. I can't quite reach standing on the ground. After dinner I would like to start placing the cattails but I am still in negotiations with the CEO for layout time after dinner. While I am up here I'll get an order into Ross. I need a couple of more switches and a bunch of Caboose ground throws. Pics......................Paul

DSCN1264DSCN1265DSCN1266DSCN1267DSCN1268DSCN1269

Attachments

Images (6)
  • DSCN1264
  • DSCN1265
  • DSCN1266
  • DSCN1267
  • DSCN1268
  • DSCN1269

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×