Well the retrieval of the lumber from the old workbench in ma-in-law's basement is on hold. The two days of warm weather brought a lot of rain, melting most of the snow, and now Mum's basement has water in it. It isn't into the workroom, but the main room needs dried out. The temperature is dropping fast, and snow is starting to fall, so we will see what I have to work with next weekend.
|