Busy busy 'round the P&L.
All the track is laid, powered, and switches wired, but only half of it is ballasted. Shifting focus to scenery.
Township was out patching holes, and finished painting the grade crossings. Also, prepping for crossing signal placement.
Got my Pepsi plant in last week. Didn't fit where I had planned originally, so added some track after my better half pointed out that the lights and signs should be seen from the front. Working on some scratch built flats for the empty wall area and siding in the background.
Got the power company trucks labeled, next is some color and weathering.
Got the hill up to Linglestown roughed in, and the auto tunnel installed
And lastly, the zoning board approved our plans for a new gas station. We expect groundbreaking as soon as the ground thaws.