Skip to main content

Reply to "What did you do on your layout today?"

Tonight I ran trains to make sure all the track was correct and the trains ran fine!  Was reading some posts about layouts and a statement by a guy about not liking lift gates or swing gates gave me a pretty good idea!    I'm going to raise the two mainlines I am running on now.  Then build another loop or three where it is now with smaller radius turns and do loop to loop track plan. I can duck under the 38.5 height duck under now. The upper mains will cross over at 49 inched if I raise it 7.  I used to do metal fab so I have the equipment and skill to build a steel bridge similar to the one Eric's Trains has.  So take away the 2x4 and plywood, and add 7 or so inches.. I can add 11 inches to the height I have to duck under..  : )     What do yall think? 

Jim 

Last edited by carsntrains

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×