Besides running some trains, I finally got the uncoupling track in the yard. One was installed on each of the 6 tracks in the yard, for switching action.
I will be installing a coaling station (pictures below) soon. I am not sure if I am going to put it in the yard or in the small siding on the other side of the layout. Once that decision is made I can finish ballast and scenic work in the yard.
Dave