Skip to main content

Reply to "What did you do on your layout today?"

Besides running some trains, I finally got the uncoupling track in the yard. One was installed on each of the 6 tracks in the yard, for switching action. 

I will be installing a coaling station (pictures below) soon. I am not sure if I am going to put it in the yard or in the small siding on the other side of the layout. Once that decision is made I can finish ballast and scenic work in the yard.

Dave

 

Attachments

Images (4)
  • Uncoupling Tracks Installed #1(Yard)
  • Uncoupling Tracks Installed #2 (Yard)
  • Coaling Station #1 (off layout)
  • Coaling Station #2 (off layout)
Last edited by luvindemtrains

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×