Skip to main content

Reply to "What did you do on your layout today?"

Pine Creek Railroad posted:

Gentlemen,

   After having Brunch with Bob and Mark from the OGR, where I picked up some MTH Terminal Blocks from Bob.  One of which Bob gave me because the prior owner damaged it buy burning up the Positive Red Banana Plug and part of the Terminal Board itself.   I decided to due a little Reconstructive MIT Engineering, and fully Repaired & Replaced the Female Red Banana Plug and Reworked the Board at the head of the Terminal Block.  

It took a little time and skill but the Big Terminal Block now operates like brand spanking new.  Thanks Bob for providing the Engineering challenge, I now have more than enough MTH Terminal Blocks to complete the Train Room layouts, both DCS and Legacy.

Thanks again guys real nice meeting you for brunch, we will do it again I am sure.

PCRR/Dave

Thanks again Mike G for the fantastic DCS HHRC Holder, with the Pine Creek Picture!

DSCN2437

 

I'm glad you got the terminal block functional again Dave, and the remote holder looks great.  Yes, that was a very nice brunch with you and Bob!!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×