Skip to main content

Reply to "What did you do on your layout today?"

As to the photos I posted over the weekend of the city level plywood. Here are some photos to give you guys an idea of how I am handling the edges.

In this photo, I have my 2nd level yard storage under the city

In order to hide it from view but still see the trains from this view. I am adding this kind of arched wall, but with some open arches to see though.

This will run from 2x2 support post on left side for 5 feet to about where the Lionel sign is in the photo. I think the wall will be a grayish brick.

http://www.studiozphoto.com/CityLevel4.jpg

I just got these photos of the viaduct wall Dave from Crescent Locomotive works just finished for me and it is on the way.
This is going to look fantastic! I can't wait until they arrive in a day or two. He did a great job with the finger joining the bricks at the corners.
The piece on left is to trim out the wood 2x2 support. The pieces on the top go behind the rectangle openings to give the step relief to the boxes. 
http://www.studiozphoto.com/Viaduct2.jpg
This shot shows all 5 feet of wall
http://www.studiozphoto.com/Viaduct3.jpg

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×