Skip to main content

Reply to "What did you do on your layout today?"

I have completed my second level on the small 5x10' layout. Expanded upper level by 6 1/2" which will allow me to have a loop for American Flyer postwar. Plan is to have total of four independent loops. I run all through DCS system except the Flyer loop will need small independent power source. Lower level has 54" and 42" while upper hopefully will incorporate Flyer 40" and one loop of 36" diameter curves. Like running four separate trains on this small layout making myself dizzy.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×