I continued the process of replacing tubular track with super snaptrack and I am almost completely done. I can run 3 separate trains NS trolley section and all are on snap track and and snap track switches. I am still short 6 42" snap track curves and 4 31" snap track as well as a few switches to relpace my 022 switches. The difference in realism is quite obvious.
John