Skip to main content

Reply to "What did you do on your layout today?"

I continued the process of replacing tubular track with super snaptrack and I am almost completely done. I can run 3 separate trains NS  trolley section and all are on snap track and and snap track switches. I am still short 6 42" snap track curves and 4 31" snap track as well as a few switches to relpace my 022 switches. The difference in realism is quite obvious.

 

John

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×