Lee - thanks for encouraging words on the brick weathering. For a long time I have been wanting to scratch-build exterior duct work on a building... So the large building flat became the first guinea pig.... It's not too bad once I got the stock cut to the right size for the ducts, and found the plastruct.... Also added security screening to the first floor windows, a new loading dock and loading dock roof.... Over the weekend I took a stab at building a tall tapered brick industrial smoke stack which will sit to the left of this flat.... Hope to have this whole back drop ready with new scratch built power line poles done and put back in place in the next day or two..
|