Skip to main content

Reply to "What did you do on your layout today?"

Leapin Larry,  Great photos,  those Santa Fe F3's pulling the El Capitan make one beautiful train.   

Al,   Thanks for sharing the photos of the removable roof electrical.   It would be a shame to permanently mount a roof on that piece of work.   Just incredible attention to detail, an amazing well done build.   

Mark -  Congratulations, you're on the way .   I know it's been a long time since the design started, and then the re-design to incorporate the expansion , so it must feel really good to be assembling benchwork.   

For me another 6 hours of wiring, and making improvements to some early wiring today, but I finally got the trains running again around 9:30 tonight.   At least now all (4)  180 watt power districts are wired in, and the 24  individual sidings, spurs and mains have all their 10 to 15 amp switches wired.     

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×